Special Solutions
Occupational safety and health

Special solutions for safety
in plants and construction projects

The "CTE System" has been specially developed for the fast and safe evacuation of all persons on high installations. Increased efficiency and increased power capacity lead to increasingly powerful wind turbines of the multi-megawatt class.

Processes such as re-powering act as an additional catalyst for this trend, and this means that a large number of turbines on which several people are present at the same time are becoming increasingly common. If extreme dangerous situations now occur (e.g. a fire in the turbine building) that require immediate evacuation, conventional rescue procedures and rescue equipment represent a life-threatening bottleneck.

Collective Tower Evacuation System®

CTE-System

CTE-System

tested and approved according to      

1.   EN 341
2.   meets the requirements of EN 5030
3.   Automatically controlled descent speed of 0,8 m/s - 1,2 m/s
4.   max. departure height 200m
5.   max. rope load 200kg
6.   easy and safe to use
7.   evacuation of large groups of people as quickly as possible
      (6 people per minute)
8.   meets the requirements of EN 50308
9.   fireproof
10. low maintenance

 

The "CTE-System" has been specially developed for the fast and safe evacuation of all persons on high installations. Increased efficiency and increased power capacity lead to increasingly powerful wind turbines of the multi-megawatt class.

Processes such as re-powering act as an additional catalyst for this trend and thus a large number of turbines on which several people are present at the same time is becoming increasingly common. If extreme dangerous situations now occur (e.g. a fire in the turbine house), which require immediate evacuation, conventional rescue procedures and rescue equipment represent a life-threatening bottleneck.r.

The Collective Tower Evacuation System® (CTE-System), which was specially developed to eliminate this bottleneck, shows that it can be done differently. With the patented CTE-System, the fastest possible evacuation and rescue of all persons from the danger zone can be carried out safely.

Depending on the installation environment, the CTE system is specifically planned, designed and implemented in the vertical or horizontal version for the corresponding environment. In the wind energy sector, the CTE-System is adapted to the specific plant (customer-specific) for a corresponding plant model. We would be pleased to adapt the system for your type of plant so that it can be taken into account from the outset in the design and manufacture of the plant type. You simply manufacture systems with a built-in evacuation system and the following applies to your systems: Team rescue included!

The vertical version is the optimal rescue solution for manufacturer-specific wind turbines.

(a) If the height of your installations increases, the CTE system grows with it.
(b) If the number of people on the installation increases, the CTE system grows with it.

LifeLine System - mobile anchorage system

The SHE LifeLine System is used as a mobile anchorage device, e.g. when working on foundations. The system consists of the abseiling and rescue lifting device SHE Rescue Lift, a 10.5 mm SHE kernmantle rope and a pretension indicator. The equipment may only be used with a safety harness according to EN361 and a lanyard with fall arrester according to EN354/355. A maximum of 4 persons can be secured to the anchorage device at the same time. 


LifeLine
System


LifeLine
System

The maximum permissible length of the SHE LifeLine system is 50m. The free span of a bay may be max. 8.5m and min. 3.0m. If the span is greater than 8.5m, an intermediate attachment for the cable must be installed, e.g. using the mobile SHE support. The pretensioning of 1KN of the SHE kernmantle rope is done by the pretension indicator.
When used at the foundation 7 supports can be installed. The supports are bolted around the foundation. Each support has an attachment point, in which the deflection pulley pre-assembled on the cable is fixed with a carabiner. The complete system is closed in a circle.

tested and approved according to   

1. EN 795:2012 Class C
2. max. system length 50m
3. max. field length 8,5m
4. min. field length 3m
5. approved for max. 4 persons

Image
SHE Solution
Bergmann GmbH & Co. KG
Im Sundernkamp 2
32130 Enger
Germany
Image
Image
Image
Image

Search

X

Right Click

No right click allowed

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.